PWM and Time-Proportional Edge Control with Titania

Using Titania protected outputs for ramps, duty-cycle control and supported PID/PWM applications close to the machine.

20 July 2026 Bacaan 3 menit Tachyonic Intelligence Sdn Bhd
PWM and Time-Proportional Edge Control with Titania

Titania supports PWM on all eight protected high-side outputs, with a documented 1 to 50 Hz range, 0 to 100 percent duty cycle in 1 percent steps and configurable ramp, hold, minimum and maximum intensity parameters. Supported modes also expose PID/PWM settings and auto-tune control.

Appropriate loads

Potential applications include stack-light dimming, proportional average power, slow thermal control and time-proportional actuation. Confirm that the connected load tolerates low-frequency PWM and that switching does not create unacceptable noise, wear or electromagnetic disturbance.

Shape the output

  • Set frequency and duty cycle for the process response.
  • Use ramp-up and ramp-down to reduce abrupt change.
  • Apply minimum intensity where the load becomes unstable below a threshold.
  • Use maximum intensity and hold time to protect the process and output stage.

PID/PWM commissioning

Start with conservative output limits, smoothing and noise tolerance. Validate the sensor input, process lag and failure response before auto-tune or closed-loop operation. Keep an independent high-limit or safety function where required.

Thermal design

Evaluate simultaneous channel current, ambient temperature, enclosure ventilation and switching duty. The 0.7 A continuous rating is subject to the documented conditions and does not remove the need for system-level thermal verification.

Technical basis: Titania Modbus DI-8 DO-8 datasheet TTN-DS-2026-001, issued 19 July 2026. Confirm the current hardware, firmware and controlled document revision before implementation.

Bacaan lanjutan

Artikel rekayasa terkait

Lihat semua

Cara kami membantu

Ada pertanyaan atau butuh bantuan teknis?

Berikan nama perusahaan, negara, aplikasi, jumlah, jenis sinyal, protokol, lingkungan pemasangan, dan target tanggal pengiriman.